07/24/2026
🏡 Want your home ready before the holidays? The clock is already ticking.
Kitchen, bathroom, and flooring projects take 2–4 months start to finish, which means if you're picturing a finished space by the time family comes to visit, now is when you need to call, not October.
Planning an ADU or addition instead? Those run 6+ months with design and permitting, so the holidays aren't the deadline... but starting now means you're ahead of the spring rush, when everyone else calls and permitting offices slow to a crawl.
Tegman Custom Homes is booking now for: ✅ Kitchen Remodels — ready before the holidays ✅ Bathroom Remodels — ready before the holidays ✅ Flooring — ready before the holidays ✅ ADUs & Additions — start now, beat the spring rush
📞 Call or text us at 503-989-3992 for a free walkthrough. Book by Aug 28th and save: 10% off Kitchen, Bath, or Flooring — or $10,000 off your ADU or Addition.
https://tegmancustomhomes.com
Licensed, Bonded, Insured. CCB #235302