Full building generator? Apollo Electrical Services, Inc does that!
Installing a commercial backup generator requires careful planning and professional expertise. Here's a general outline of the steps involved in the installation process:
1. Assess your power needs: Determine the power requirements of your commercial facility by calculating the total load that the backup generator needs to support. Consider essential equipment, lighting, heating, ventilation, air conditioning (HVAC), and other critical systems.
2. Select an appropriate generator: Choose a generator that meets your power requirements. Consider factors such as fuel type (e.g., diesel, natural gas, propane), generator size, noise level, emissions, and the type of automatic transfer switch (ATS) needed.
3. Obtain necessary permits: Contact your local building department or municipality to inquire about any permits or approvals required for installing a commercial backup generator. Compliance with local building codes, noise regulations, and environmental regulations is essential.
4. Hire a professional: Engage a licensed electrical contractor or a generator installation company with experience in commercial installations. They will ensure a safe and compliant installation and handle the necessary electrical work.
5. Site evaluation: Work with your installation team to evaluate the best location for the generator. Consider factors such as access for maintenance, proximity to fuel sources, ventilation requirements, noise considerations, and any local code requirements.
6. Prepare the site: Clear the designated area and ensure it is level and stable. Install a concrete pad or a suitable foundation to support the generator's weight. Ensure proper clearance around the generator for maintenance and ventilation.
7. Electrical and fuel connections: Your installation team will handle the electrical wiring, including connecting the generator to the building's electrical system through an ATS. They will also connect the generator to the appropriate fuel source (e.g., natural gas line, propane tank, diesel fuel tank).
8. Exhaust and ventilation: Install an appropriate exhaust system to safely vent the generator's exhaust gases away from the building. Ensure compliance with local regulations regarding exhaust emissions and noise levels.
9. Automatic transfer switch (ATS): The ATS monitors the utility power supply and automatically switches to generator power when an outage occurs. It's a critical component of the backup power system and should be properly installed and tested.
10. Testing and commissioning: Once the installation is complete, the generator and transfer switch should undergo comprehensive testing to ensure proper functionality. Test the generator under load to verify its ability to support the required power demand.
11. Maintenance and monitoring: Establish a routine maintenance schedule for the generator and adhere to the manufacturer's guidelines. Consider remote monitoring systems that can alert you or your service provider in case of any issues.