What Happens Before Your Electrical Inspection?
If you’ve hired us for a panel upgrade, remodel, or new circuits, there’s a good chance an inspector will be stopping by. Here’s what goes on behind the scenes, and how you can help it go smoothly.
1. The permit comes first.
Before any work starts, we pull a permit with your local jurisdiction. It’s what makes the inspection happen, and it protects you. Permitted, inspected work matters for your safety, your insurance, and when you sell your home.
2. We do our own check before the inspector does.
Before we call for inspection, we walk the job ourselves: connections tight, boxes secured, wire properly supported, breakers sized right, grounding and bonding in place, GFCI and AFCI protection where it’s required, and the panel labeled clearly. We’d rather catch something ourselves than have the inspector find it.
3. Rough-in vs. final.
Many jobs get inspected twice. The rough-in happens before walls are closed up so the inspector can see the wiring. The final happens once devices, covers, and fixtures are installed and everything’s powered up. If you’re remodeling, please don’t let drywall go up until rough-in passes!
4. How you can help on inspection day:
Clear a path to the electrical panel and any work areas
Keep pets secured
Make sure someone’s available to let the inspector in (we’ll let you know the window)
Leave the permit card posted where the inspector can see it
5. What if something doesn’t pass?
It happens, and it’s not the end of the world. We fix the items noted and schedule a re-inspection. You’ll know exactly what was flagged and what we did about it.
An inspection is a second set of trained eyes on the work in your home. We welcome it.
Questions about an upcoming project? Send us a message!