C&C Carpentry

C&C Carpentry We take pride in every job that we do and we pay close attention to the details that makes us stand out above our competitors.

If you are looking for a company that offers quality craftsmanship, then you have come to the right place.

We recently completed a basement renovation project that presented distinct challenges due to low ceiling heights and th...
05/03/2026

We recently completed a basement renovation project that presented distinct challenges due to low ceiling heights and the requirement of installing bulkheads around structural beams and ductwork. Despite these obstacles, the final result is visually appealing. To achieve energy efficiency, our team installed 1 inch foam board insulation on the concrete walls to create a thermal break, and then insulated the framed walls with R13 fiberglass insulation. We also had to cut out the floor in areas to install plumbing for a bathroom and laundry room area.

We've been busy so far this year with several projects. Here is a beautiful new kitchen we installed earlier this year. ...
03/30/2026

We've been busy so far this year with several projects. Here is a beautiful new kitchen we installed earlier this year. Stained maple cabinets and quartz countertops courtesy of Dixon's Floor's and More in Ottumwa.

We recently completed a stunning kitchen remodel, where our team worked efficiently as everything was removed and ready ...
02/04/2026

We recently completed a stunning kitchen remodel, where our team worked efficiently as everything was removed and ready for us at the start of the project. The kitchen boasts striking hickory cabinets and quartz countertops, complemented by all-new stainless steel appliances. The darker walnut and corrugated metal accents on the island's ends and back were installed by the homeowner. Furthermore, we installed matching bathroom cabinetry, and a new Andersen French door was installed in the family room.

What a transformation of this room. It was merely a catch-all spare room with a dropped ceiling and wall paneling. It ha...
01/28/2026

What a transformation of this room. It was merely a catch-all spare room with a dropped ceiling and wall paneling. It had 9 windows and an exterior door. We completely renovated, removed 4 windows, removed the door and converted this into another bedroom with 2 open concept closets and everything brand new. Call us today for all of your remodeling and new construction needs. 641-7770589

I inadvertently omitted posting the final pictures of the 1,100 sq ft addition we completed this summer, featuring 2 bed...
12/20/2025

I inadvertently omitted posting the final pictures of the 1,100 sq ft addition we completed this summer, featuring 2 bedrooms, 1 large family room, utility room, and a walk-in pantry. The addition also includes a 10x10 composite deck with aluminum railing, as well as vinyl plank flooring throughout. The outcome surpassed our customers expectations.

Are you aware of the fact that now is the ideal moment to initiate strategic planning for your spring projects? Although...
12/06/2025

Are you aware of the fact that now is the ideal moment to initiate strategic planning for your spring projects? Although winter is just beginning, this is the perfect time to lay the groundwork for spring and summer projects, as we are currently scheduling those jobs. Reach out to us today at 641.777.0589

We installed a few new vinyl windows and all new maple extension jambs and trim. Removed this bay window above the kitch...
11/14/2025

We installed a few new vinyl windows and all new maple extension jambs and trim. Removed this bay window above the kitchen sink. These windows were installed 30 years ago by my dad and my uncle. We will replace the rest of the windows next spring.

This week's project was replacing 2 exterior doors on a house that is only 4 years old. This house was built by a builde...
11/01/2025

This week's project was replacing 2 exterior doors on a house that is only 4 years old. This house was built by a builder from the area that did not use any sealants or flashing of any kind, and refused to fix the problems. There are still 2 more doors to fix properly. We had to replace the exterior sheeting, patch rotten sub flooring and even cut out and replace part of the floor system. We had to temporarily support the 2nd floor deck to cut out the rot behind it. Keep in mind, this is only 4 years old!

Bathroom update we did last week. This was original from 1978, it was time for a change!
10/04/2025

Bathroom update we did last week. This was original from 1978, it was time for a change!

Are you dreaming of a new kitchen? Take a look at this fully remodeled kitchen we did earlier this summer. Its small, bu...
10/02/2025

Are you dreaming of a new kitchen? Take a look at this fully remodeled kitchen we did earlier this summer. Its small, but beautiful and functional. All new maple cabinets, high resolution countertops with under mount sink, tile backsplash, all new flooring and appliances. We removed the old outdated cabinets and the soffit above, plus removed 1 of the half walls to open it up and make it more inviting.

Address

Ottumwa, IA

Telephone

+16417770589

Website

Alerts

Be the first to know and let us send you an email when C&C Carpentry posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to C&C Carpentry:

Share

Category