Advanced Electrical Services Inc.

Advanced Electrical Services Inc. Established in 1996, Advanced Electrical Services INC has been providing impeccable service to the P

04/20/2022

20ft Baja Outlaw 350 mercruiser series ground and electrolysis problem's

04/20/2022

Scrap King south Tampa 7 days a week.

01/09/2019

The feeder side of the metal eating shredder.
Guess I would say Eco Green dirty dangerous job. Turning trash into cash and saving the landfill, and environment.

I actually do some simple electrical work occasionally custom ceiling fan and lights.
01/09/2019

I actually do some simple electrical work occasionally custom ceiling fan and lights.

600 amp 480 volt Motor control cabinet, 1 of 3 single phase series parallel transformers  480 to 120 bad secondary. Disc...
01/09/2019

600 amp 480 volt Motor control cabinet, 1 of 3 single phase series parallel transformers 480 to 120 bad secondary. Disconnected cleared fault moved control circuits to 2 remaining live phases test system, ready for work again. Needs to replace the wall blown away from the hurricane last year. Rain keeps getting into the system, already replaced main breaker water rain out when removed. This place is like a box of chocolate never know what's going to melt next.

Safety most important thing in the workplace, replaced broken, Emergency Stop button steel bandsaw.
01/09/2019

Safety most important thing in the workplace, replaced broken, Emergency Stop button steel bandsaw.

6,000 Horse power 4160 volt shredder motor bypass failed PLC on reastat control install 2 manual push buttons. Plates ha...
01/09/2019

6,000 Horse power 4160 volt shredder motor bypass failed PLC on reastat control install 2 manual push buttons. Plates have to be 100% at the top, to start motor.Best running torque is 45-65% based on materials being ripped to pieces. The reastat and motor starter are interfaced together. Manufacturer of reastat no longer in business, only put this all together 4 years ago. Largest electric motor I've got to wire and maintain in my 23 years in business.

Before and after rebuilt control box commercial 3 phase steel bandsaw.
01/09/2019

Before and after rebuilt control box commercial 3 phase steel bandsaw.

Lift station contoller didn't work when I got there. Working like it was designed to when I finished. Don't know why man...
01/09/2019

Lift station contoller didn't work when I got there. Working like it was designed to when I finished. Don't know why manufacturer used black and yellow as neutrals. And red as power only, standards I've never seen before.
All I can say is love the challenge of motor controls.

Burned out motor control transformer, melted a lot of wiring. Cleaned up the old dusty spare rewired installed proper co...
01/09/2019

Burned out motor control transformer, melted a lot of wiring. Cleaned up the old dusty spare rewired installed proper control fuse size, run test good to go.

A little bit of clean up and proper identification of Generator and Battery backup systems, data room Palmetto Police De...
01/08/2019

A little bit of clean up and proper identification of Generator and Battery backup systems, data room Palmetto Police Department. New servers coming clean steady power ready.
How about the fan cooling Verizon wireless network system mounted were it doesn't belong directly under live electrical panel.

12 new photos ยท Album by Billy Parks

Address

3511 39th Street E
Palmetto, FL
34221

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Telephone

+19417568717

Alerts

Be the first to know and let us send you an email when Advanced Electrical Services Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category