04/10/2026
MARCH 2026
Kitchen remodel.......Removed all base cabinets and countertop. Cleaned up flooring and patched where needed. Laid new luan plywood on the floor and installed new base cabinets and new countertop cut to fit. Installed new sink with faucet, replaced shutoff valves and new drain. Cut old water lines out and replaced with new copper.
Customer is going to lay the new flooring tile and baseboard trim