Onion Flats Architecture

Onion Flats Architecture Onion Flats Architecture

Compatibility and materiality: what happens when things just don’t "stick"?We recently encountered a site-side challenge...
04/29/2026

Compatibility and materiality: what happens when things just don’t "stick"?

We recently encountered a site-side challenge where a high performance sub-slab v***r barrier refused to adhere to foundation walls that had been treated with a fluid-applied air barrier. On paper, these products were technically compatible. In reality, the construction site had other plans.

We brought in the product reps for both systems, attempted heavier-duty "claw-type" tapes, and re-prepped the surfaces, but we still couldn't get the bond we needed for a passive-house level seal.

The solution? We pivoted to a tried-and-true mechanical termination bar detail to fasten and seal the top edge of the membranes to the vertical surface.

This is the reality of high performance building: you can have the best data sheets in the world, the best details and the best intentions, but you always need a "Plan B" that accounts for the variability of the field. Sometimes the simplest mechanical solution is the most resilient one.

Address

126 E Market Street
Philadelphia, PA
19106

Alerts

Be the first to know and let us send you an email when Onion Flats Architecture posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Featured

Share