03/23/2022
We finished this one 2 days ago. Before it was a bar top and it bothered the homeowner. So we cut it down and made it one solid flat surface.
The customer always wanted a dual color theme kitchen and this lighter stone is the same grade of stone as the perimeter so it flows well for the homeowner. This lead time was 8 business days from start to finish. Due to the size of this a entire slab was required to complete the project. Homeowner is a plumber himself so he is doing the installation of the faucet.