10/10/2026
3 guys knocked out a double gas split attic ground 2 story in one day! Crane used to get condensers in back yard. Great job. No short cuts. Also used customers existing thermostats so we save d time there. New pads, new disconnects with whips, low voltage ran in flex conduit. New gas flex lines with shut offs. Added drip legs. New return and supply plenums. Hung with all thread and unistrut, new pans the length of the system. Brazed with nitrogen, vacuumed down to 350 microns and decay test was good on both. Charged to manufacture specs. It was a good day. Could not have done this at 115 though.