02/27/2025
The temporary utility pole is set, inspected, and ready for the electric company to install the construction service.
The electricians removed most of the old wiring and wired new lights in the attic to accommodate the removal of the two furnaces. After removing the furnaces, we will vacuum and clean the entire attic.
We had a consultation meeting with the electrical and plumbing inspector, which went well. Our team and the city are all on the same page on this full-gut remodel in the Garden District.
The plumbing company laid out the new plumbing and will return on Monday to start removing the pipe and replumbing the home.
The dumpster company switched out a small dumpster that was brought by mistake and left us a 20-yard dumpster. Parking and changing out dumpsters have been a challenge for the narrow brick street in the middle of the city.