10/20/2026
Approximately 8.3 miles of a client's fiber network was potentially at risk on a transportation project. Trevor Bennett, JDH's Lead Project Engineer, explains how detailed analysis and field verification narrowed the work to less than 1,500 feet of relocation, a few handhole relocations, and minor duct adjustments.
Read the project breakdown and engineering approach at at the link below!
https://jdhinfrastructure.com/fiber-conflict-analysis-reduced-relocation/