03/25/2025
We are currently three weeks ahead of schedule at Portland’s next Escapology . We have drywall up on one side of each wall while our Low Voltage team installs all the low voltage for the games. We also have our HVAC team finishing up our ducting. Next step is insulation and the rest of drywall. Escapology