09/01/2026
Last month, Acorn Engineering, on behalf of High Peaks Alliance, received final Planning Board approval for the Sandy River Bridge in Farmington, Maine.
This new 340-foot multi-use bridge will reconnect the Whistle Stop Trail to downtown Farmington, creating a safe and accessible crossing for pedestrians and snowmobilers while strengthening connections between western Maine's outdoor recreation network and the local business community. The bridge will ultimately be owned and managed by the Maine Bureau of Parks and Lands as part of the Whistle Stop Trail system.
Led by High Peaks Alliance in partnership with the Maine Bureau of Parks and Lands and numerous community stakeholders, the project represents nearly two decades of planning, collaboration, and advocacy. Beyond improving recreation and trail access, the bridge is expected to support economic activity by attracting additional trail users and visitors to downtown Farmington.
Acorn is providing site/civil engineering design and permitting services in collaboration with Flycatcher LLC, while Thornton Tomasetti is providing structural engineering services in support of the local approval process. GEI Consultants, Inc. provided the preliminary H&H and geotechnical analysis. Credit to Richardson & Associates for the provided renderings of the bridge.
We're proud to be part of a project that will enhance outdoor access, community connectivity, and economic vitality in the region. Congratulations to High Peaks Alliance, the Bureau of Parks and Lands, the Town of Farmington, and the many partners who have helped move this project forward.