09/02/2026
Day 2- this was a solo day on this shower remodel. I was able to set the grab bar blocking, add blocking to the left side for the shower door, moved the vanity outlet over a few inches to be out of the shower area, removed the old shower light/ added 2 new led recessed lights, dug out the drain to relocate it to the proper spot, capped the old shower drain, backfilled/poured concrete to fill in the drain areas, installed the drywall/cornerbead, and got most of the rough shower walls installed.