Inspection Filing Process
LL152 inspections must occur within the calendar year denoted in the Inspection Cycle for those applicable buildings.
Within 30 days of the inspection, the licensed master plumber (LMP) must provide to the building owner a Gas Piping System Periodic Inspection Report (GPS1).
Within 60 days of the inspection, the OWNER must submit to DOB a Gas Piping System Periodic Inspection Certification (GPS2) signed and sealed by the LMP who conducted or supervised the inspection. GPS2 submission is to be completed by the Building Owner on the NYC Department of Buildings GPS2 submission portal. There is no filing fee. According to DOB, no login will be required but DOB reiterated that the law and rule state that the owner must submit the GPS2 form that has been completed by the LMP.
If the Inspection Certification submitted to DOB indicates that conditions requiring correction were identified in the Gas Piping System Periodic Inspection Report submitted to the owner, the owner must submit to DOB, within 120 days of the inspection, an Inspection Certification signed and sealed by the LMP who conducted the inspection, stating that the conditions have been corrected.
If the Inspection Certification submitted to DOB indicated that additional time was needed to correct the condition(s) identified in the Inspection Report, the owner must submit, within 180 days of the inspection, an Inspection Certification signed and sealed by an LMP stating that all conditions have been corrected.
Correction of conditions identified in the Inspection Report must be performed in compliance with the NYC Construction Codes, including obtaining any required work permits.
All reports and certifications must be kept on file by the inspection entity and the building owner for 10 years.