07/09/2026
💥Building a Deck This Summer? Skip the Concrete Wait💥
👉Traditional deck footings require excavation, forming, pouring concrete, and then waiting for it to cure — often 24 to 48 hours minimum before any framing can begin, and longer for full strength.
👉Helical piles are steel shafts with helix plates that are mechanically screwed into the ground to load-bearing depth. There's no excavation, no forms, and no curing time.
👉A typical deck helical pile foundation can be installed and ready for framing in a single day — sometimes within a few hours, depending on the number of piers needed. Because the installation doesn't depend on concrete trucks or curing schedules, your framing crew can start the same day.
👉Helical piles are installed to depths and torque values engineered for your specific soil conditions, so they perform reliably whether your site has clay, expansive soils, or fill. Every installation is backed by a 30-year warranty on the piles themselves and a limited lifetime warranty on workmanship — giving you the same long-term confidence as a concrete foundation, without the wait.
For more information visit www.goliathtechsd.com or call the office at 605-705-4799
MORE THAN MERE INSTALLERS WE ARE THE PILLARS OF YOUR PROJECTS GoliathTech offers a helical pile system that provides exceptional benefits to your company. The installation is typically done in one day and the construction can begin immediately after the piles have been installed. Installation is...