Clear Leaf

Clear Leaf Utility pipe subcontractor working real jobs in the field.

Storm & utility pipe, equipment, and jobsite life — field-tested tools, trade tips, and real talk from the trench.

🛠️ Tools we actually run → link in bio

09/03/2026

Grease pins every morning or replace bushings every year. Pick one.

Send a message to learn more

09/02/2026

Had to throw down a temp patch so heavy traffic doesn't tear up the trench overnight. Hand-prepped the subgrade, ran full compaction, and left the asphalt half an inch to an inch high so traffic rolls it in smooth.

What a nice Wednesday just another day to get better at the craft
09/02/2026

What a nice Wednesday just another day to get better at the craft

09/02/2026

The sound of a hydrovac hitting solid bedrock never gets easier on the ears.

Send a message to learn more

09/01/2026

3 steps to seat utility pipe flush every time without ruining the gasket.

L**e the spigot thick
Align before the stab
Drive it home flush

Time for some storm tech systems.
09/01/2026

Time for some storm tech systems.

09/01/2026

If your ground hand can't read a grade stake, your bucket is moving twice as much dirt.

Send a message to learn more

08/31/2026

If you don’t see a flow line cut on your grade stake, don’t panic. That usually means you are looking at a finish grade stake rather than a structure stake.

Here is the exact step-by-step breakdown for reading the wood on a Pressure Irrigation Stub (P.I. STUBB):

Offset & Centerline: The top line shows 20 circled with CL. That means you pull a 20-foot straight offset from the hub to hit your target point.

Structure Identification: P.I. STUBB identifies a pressure irrigation stub line capped off for a future connection.

Cut to Finish Grade: C 0.08 F.G. tells you your hub is sitting just 0.08 feet (1 inch) higher than your final grade. Shave that inch off to get your surface dirt dead-on.

No Flow Line Cut: Since there is no invert listed, you set your finished grade surface first, then dig down to your standard 48 -inch bury spec off final grade to clear frost lines.

The Hub & Line Stake: Do all your vertical math off the top of the hub. Look right behind it for your line stake—sight across both stakes to keep your 20-foot offset pulling dead straight every time.

Don't have a good day have a great day.
08/31/2026

Don't have a good day have a great day.

08/31/2026

Trench box or slope it back? Depends on the ground, but safety pays the bills.

Send a message to learn more

Address

Serves Utah County
Richfield, UT

Opening Hours

Monday 7am - 4pm
Tuesday 7am - 4pm
Wednesday 7am - 4pm
Thursday 7am - 4pm
Friday 7am - 4pm
Saturday 7am - 4pm
Sunday 7am - 4pm

Telephone

+18014307862

Alerts

Be the first to know and let us send you an email when Clear Leaf posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Clear Leaf:

Shortcuts

Share