04/27/2026
From start to finish, our team successfully completed the bathroom renovation project. We hung drywall, applied tape and four coats of mud, and added an orange peel texture to the walls. The ceiling features a sanded swirl texture, which was expertly blended. We finished the project with a PVA primer today. The result is a stunning bathroom, ready for tile surround and paint, thanks to the excellent collaboration with our clients.