Bellefield Transmission Line Project // Next time you see a construction project, look close—you might be surprised by what’s making the work possible.
🔺 PROBLEM
Renovation and construction work on 21 transmission towers across seven remote Mojave sites required safe access to elevated work zones. High winds, dust storms, harsh weather, active roadways, and complex tower configurations made conventional access methods, including bucket trucks, difficult and unreliable.
🔶 SOLUTION
SkyLine designed and installed custom scaffold access systems for each tower and site, including cantilevered platforms and specialized decking to accommodate complex geometries. Every system was engineered for winds up to 80 mph and shrink-wrapped to fully enclose the work areas, protecting crews and materials from wind, dust, rain, and intermittent snow.
🔷 RESULTS
The custom access systems provided safe, reliable, weather-protected work platforms across all 21 transmission towers. By maintaining required clearances and creating stable working conditions in a challenging desert environment, SkyLine helped crews efficiently complete critical structural and electrical upgrades while keeping the project moving without interruption.
𝘌𝘷𝘦𝘳𝘺 𝘱𝘳𝘰𝘫𝘦𝘤𝘵 𝘴𝘵𝘢𝘳𝘵𝘴 𝘸𝘪𝘵𝘩 𝘢 𝘱𝘳𝘰𝘣𝘭𝘦𝘮. 𝘖𝘶𝘳 𝘫𝘰𝘣 𝘪𝘴 𝘵𝘰 𝘣𝘶𝘪𝘭𝘥 𝘵𝘩𝘦 𝘸𝘢𝘺 𝘪𝘯. 𝗦𝗼𝗹𝘃𝗲. 𝗕𝘂𝗶𝗹𝗱. 𝗘𝗹𝗲𝘃𝗮𝘁𝗲.