Steinke Masonry & Drywalling

Steinke Masonry & Drywalling All new masonry and repair. Also finish drywalling and plaster.

Forgot to show this one. Chimney wrapped with thin brick. Did it between the drywall job. I also finished the drywall ea...
06/14/2026

Forgot to show this one. Chimney wrapped with thin brick. Did it between the drywall job. I also finished the drywall earlier.

Laid cement block for patio walls early spring. Now I'm back putting cultured stone on. Wi'll have future pictures Of th...
06/13/2026

Laid cement block for patio walls early spring. Now I'm back putting cultured stone on. Wi'll have future pictures Of the process.

Also did a little fireplace in between time.
06/13/2026

Also did a little fireplace in between time.

In case anybody was wondering this is what I've been doing. Most of the basement has been painted. Two bedrooms in the b...
06/13/2026

In case anybody was wondering this is what I've been doing. Most of the basement has been painted. Two bedrooms in the basement along with the bathroom and sitting area. Upstairs consisted of two bedrooms, two walk-in showers, great room with an 18-ft ceiling. Both bedrooms upstairs had smooth ceilings. Everything else was hit skip.

Went back to a job that I installed real stone on the outside and a bookcase/ wood stove back area in the basement. Fini...
04/23/2026

Went back to a job that I installed real stone on the outside and a bookcase/ wood stove back area in the basement.
Finish drywall in the basement. Walls are smooth.
Ceiling and all of stairway is Hit/ Skip with no sand.

Someone is learning to drive. Everyone makes a mistake. Thankfully no one was hurt. Cultured stone was left over from wh...
04/08/2026

Someone is learning to drive. Everyone makes a mistake. Thankfully no one was hurt. Cultured stone was left over from when they built new. This is why you want to keep left over stone, brick, and of course cultured stone.

Did a little finish drywalling. Smooth ceiling and all. I don't do them too often. Also did something new on a fireplace...
02/24/2026

Did a little finish drywalling. Smooth ceiling and all. I don't do them too often. Also did something new on a fireplace in the same room.

I am officially ready for Christmas
12/10/2025

I am officially ready for Christmas

Happy Holidays
12/10/2025

Happy Holidays

Finished this a couple of weeks ago. Mortar is 40a and the stone is Russet Terra Cut by Provia
11/23/2025

Finished this a couple of weeks ago. Mortar is 40a and the stone is Russet Terra Cut by Provia

Address

145 Marsh Drive
Saint Marys, OH

Opening Hours

Monday 7am - 6pm
Tuesday 7am - 6pm
Wednesday 7am - 6pm
Thursday 7am - 6pm
Friday 7am - 6pm

Telephone

+14197337329

Website

Alerts

Be the first to know and let us send you an email when Steinke Masonry & Drywalling posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Steinke Masonry & Drywalling:

Share