09/09/2026
🔨 Another Bathroom Transformation Complete!
This bathroom received a full update from top to bottom — including some important improvements behind the walls.
For this project, we updated:
• Large-format tile shower
• Pebble stone shower floor
• Gold shower fixtures and hardware
• New vanity and countertop
• New lighting and mirror
• New flooring
• Fresh paint
• New trim and finish work
• Schluter waterproofing system behind the shower tile
• Removed the existing galvanized water lines and replaced them with new copper piping
• Updated plumbing connections throughout the bathroom
We really like how the dark shower tile and pebble stone floor came together with the gold finishes and green walls.
And while the finished details are what you see, upgrades like replacing the old galvanized plumbing with copper are just as important. When we remodel a space, we want what’s behind the walls done right too.
📞 Zobel Remodeling | 262-744-4412
🌐 zobelremodeling.com