05/20/2026
From prep to final topcoat 🔥
Just wrapped up this floor for The Juicery at The Point in Littleton — right off 495 at Exit 80.
This project included:
• Full surface prep
• Epoxy base coat
• Second coat application
• Durable polyaspartic topcoat for long-term protection
A clean, durable floor built to handle the daily traffic while keeping the space looking sharp. Appreciate the opportunity to get this one done. 👊