3 label rules solar crews need to know 🔶
🏠 Hadley, MA: the placard goes up BEFORE the final. Permanently mounted on site, not handed to the homeowner, mailed or left for the inspector. Missing, temporary or wrong = automatic fail + re-inspection fee.
🏢 Presidio Trust (commercial): “WARNING: PHOTOVOLTAIC POWER SOURCE” on DC conduit every 10 ft, within 1 ft of turns and at penetrations. White on red, 3/8” all-caps Arial, reflective.
⚡ Somerset County, PA (ground-mount): voltage-hazard signs at every pad-mount transformer and substation, and on the fence. $1,000 fine, and each day is a separate offense.
📘 7 states now enforce the 2026 NEC: MA, ME, ND, CO, MN, TX, OR. Next up: Washington, Dec 31, 2026.
Our 02-013 red & white reflective conduit label, HP02 custom house placard and 06-013 aluminum DANGER HIGH VOLTAGE sign are on the site.
Order labels at fcdlabels.com 👉 https://www.fcdlabels.com/products/02-013 or call (855) 792-4680.
Sources: Hadley, MA Fire Dept. (updated Oct 1, 2026) · Presidio Trust Fire Marshal SDS-002 (rev. Sept 28, 2026) · Somerset County, PA Solar Facilities Ordinance (adopted Oct 20, 2026) · Electrical Contractors & Wiring, Oct 26, 2026