05/04/2026
Valentine Corporation has been busy with the Bermuda Drive bridge replacement project, a tight access complicated job for the City of San Mateo.!
Picture dump of sheet pile abutment shoring, aquadam cofferdam (think giant water balloon dams) ,channel bypass piping installation, and load testing of torque down bridge piling πͺ