05/28/2026
Back at a project we built onto last year.
Last season we built the connected second-story deck along with the smaller lower deck underneath it. Now we’re back upgrading the attached second-floor addition/sunroom.
The room originally had 4 older sliding glass doors that were leaking and causing problems behind the walls. So we tore it back properly and started rebuilding it to support 3 new large frame windows.
So far we’ve:
✔ Removed all 3 leaking sliders
✔ Opened walls and repaired framing where needed
✔ Insulated wall cavities
✔ Installed new plywood sheathing
✔ Wrapped everything with Tyvek weather barrier
Next we’ll be cutting in and installing 3 large frame windows, installing a new slider on the deck side, then moving into the interior/exterior trim and siding work.
A lot of construction looks good when it’s finished. The real difference is what’s behind the walls after the job is done.
We try to approach projects with the mindset that if we’re going to open something up, we’re going to fix it in a way that gives the homeowner confidence long after we leave the site.
Honestly, getting called back by previous customers to keep improving their home is one of the best parts of this work.
– Alex & the team