Craig TerBush Builders

Craig TerBush Builders After 45 years in business Craig has decided to retire! We want to thank all our customers , who bec

Permanently closed.

Craig founded Craig TerBush Builders in 1976 starting as a remodeling contractor which included kitchens, baths, decks, garages, window replacements, custom stick built homes and additions. In 1993 we became an authorized Alta Log Home Dealer adding yet another dimension to the business

It has been a busy time for Craig TerBush Builders this summer. All aspects of construction have been going on from exca...
08/03/2020

It has been a busy time for Craig TerBush Builders this summer. All aspects of construction have been going on from excavation and block foundations to framing new additions sheetrock roofing and siding trim work and interior painting.

Remodeling an entire house with new layout and new windows and trim as well as upgrading to spray foam insulation in the...
05/18/2020

Remodeling an entire house with new layout and new windows and trim as well as upgrading to spray foam insulation in the now vaulted ceilings for super energy savings!!

Just finished a large deck project using Trex composite decking and railings which will provide the homeowner with a low...
08/02/2018

Just finished a large deck project using Trex composite decking and railings which will provide the homeowner with a low maintenance deck to enjoy for many years to come

It's been a summer of building decks! Here are 2 of the decks we built. Both with Trex composite decking which means lit...
10/13/2017

It's been a summer of building decks! Here are 2 of the decks we built. Both with Trex composite decking which means little to no maintenance. One has a plastic railing system and the other with a cable style railing which allows for more modern look and more visibility through the rails.

Spacious great room.
05/08/2017

Spacious great room.

Here are some views from the loft.
05/08/2017

Here are some views from the loft.

05/08/2017
The exterior steps and log railings  have started to come together. Second coat of stain is being applied after the caul...
04/28/2017

The exterior steps and log railings have started to come together. Second coat of stain is being applied after the caulking was completed

04/28/2017

Address

Schenevus, NY

Alerts

Be the first to know and let us send you an email when Craig TerBush Builders posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category