06/05/2026
(Slaps paver) “that ain’t going anywhere”
Longevity in your patio begins with thorough preparation and base compaction. For this impressive 2800 square ft driveway, our crew has installed 20-24” of open grade aggregate base material, totaling over 155 tons. The process involves proper compaction of site soils, installation of heavy specialty hardscape fabric, compacting the base in 3-4” lifts, constructing a retaining wall with geo grid on either side, and finishing with 1” of chip stone screeded out to ensure a perfect level.