MacNeil/DuBose LLC

MacNeil/DuBose LLC MacNeil/DuBose LLC

Drywall is up! Beacon house is starting to look like a home.
09/07/2019

Drywall is up! Beacon house is starting to look like a home.

Up goes the siding on our beacon house.
08/08/2019

Up goes the siding on our beacon house.

Up up and away. Roof is finally on!
07/07/2019

Up up and away. Roof is finally on!

Up go the walls on our beacon hill house.
06/20/2019

Up go the walls on our beacon hill house.

Parking garage removed in a cap hill building. Building re powered.  2 studios, 1- 2 bedroom and 1- 1 bedroom added. Bef...
06/17/2019

Parking garage removed in a cap hill building. Building re powered. 2 studios, 1- 2 bedroom and 1- 1 bedroom added. Before, during and after pics.

Beacon hill house starts framing.
06/15/2019

Beacon hill house starts framing.

In goes the foundation.
04/18/2019

In goes the foundation.

Breaking ground on our new house build.
02/28/2019

Breaking ground on our new house build.

Framing begins. 4 unit addition.
07/26/2018

Framing begins. 4 unit addition.

New Concrete in our 4 unit addition.
07/18/2018

New Concrete in our 4 unit addition.

The floor come out in our Capitol Hill project. This old parking garage will house 4 new units
06/14/2018

The floor come out in our Capitol Hill project. This old parking garage will house 4 new units

Address

Seattle, WA

Alerts

Be the first to know and let us send you an email when MacNeil/DuBose LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to MacNeil/DuBose LLC:

Share