8PINE. INC.

8PINE. INC. Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from 8PINE. INC., Construction Company, 101 N. Main Street Suite #2, Shawano, WI.

06/19/2026

Cooling a building… with the earth itself? Now that’s next-level thinking. ❄️🌍

Did you know some buildings use underground water to naturally cool themselves? By tapping into stable temperatures below the surface, these systems reduce energy use while keeping things comfortable above.

At 8PINE., smart systems and efficiency are always part of the plan. It’s not just about building—it’s about building better, with performance that lasts. 💪

Because when you work with the environment instead of against it, everything runs smoother.

.

If you’ve noticed a little more activity on our TikTok lately, you can thank Isaac and Alex.These two are spending summe...
06/19/2026

If you’ve noticed a little more activity on our TikTok lately, you can thank Isaac and Alex.

These two are spending summer helping us capture the people, projects, and personality behind 8PINE. and let’s just say they’ve got a few things up their sleeves yet.

If you’re not following along, now might be a good time. 👀

Big things, plenty of laughs, and a behind-the-scenes look at what we’re building every day.

Stay tuned.

06/18/2026

The school store at the Greenheck Turner Community Center is getting a fresh new look thanks to the crew at 8PINE. 🛠️✨
Walls are changing, spaces are transforming, and this remodel is giving the store a whole new face. From the first swing of a hammer to the finishing details, the 8PINE. team is hard at work creating a space that will be welcoming, functional, and ready to serve students, staff, and visitors for years to come.
It’s always exciting to watch a remodel take shape and see an older space turn into something brand new. Stay tuned because this transformation is just getting started! 👀
.

06/17/2026

BIG pieces are arriving at the Wisconsin Dairy State Cheese Company! 🧀🏗️

The filtration system is now on site and being prepped for installation as the 8PINE. crew powers through some of the final stages of this project. After months of steel, concrete, tanks, piping, and nonstop progress, the next major step is officially rolling in.

There’s a different kind of energy on site right now. You can see the finish line starting to come into focus as crews coordinate equipment, staging, and installation prep to bring this facility fully to life.

From the ground up, it’s been incredible watching this project take shape piece by piece, and the momentum keeps growing with every passing day. Great work by everyone involved in making it happen! 💪

.

06/16/2026

🎉 ONE YEAR OF BECKY WHITE 🎉

A year ago, Becky White joined the 8PINE. team… and we’ve been better because of it ever since. 💪✨

Over the last 12 months, Becky has brought dedication, positivity, teamwork, and a hardworking attitude that helps keep everything moving forward. Every strong company is built by strong people behind the scenes and in the day-to-day grind, and Becky has become an important part of what makes 8PINE. successful. 🛠️🔥

From busy days to big projects, Becky continues to show what being part of a team is all about. Her effort and commitment do not go unnoticed, and we are incredibly thankful to have her as part of the 8PINE. family.

One year down… and we’re just getting started. 🚧⚡

Help us celebrate Becky’s 1-year anniversary with 8PINE. by dropping a 🎉 in the comments! 👇

. .

06/15/2026

The crew at 8PINE. is hard at work at Weston Wells and the momentum is building fast! 🚧👷‍♂️

It may not look like much just yet, but some of the most important work is happening right now. The foundation is in, underground piping is being installed, and the groundwork is being set for something big. Every pipe, measurement, and pour is another step toward watching this structure rise from the ground.

Before long, steel, walls, and a full building will start taking shape and this site will look completely different. Big things are coming at Weston Wells and we’re excited to keep pushing this project forward! ⚙️🏗️

.

06/12/2026

Hidden inside one of the world’s tallest buildings… a giant swinging guardian. ⚖️🏙️

Did you know a skyscraper in Taiwan uses a massive 660-ton sphere to stay balanced during earthquakes? Suspended between floors, it sways in the opposite direction of the building—helping keep everything steady when the ground starts moving.

At 8PINE., we might not be installing giant spheres, but the mission is the same—build with stability, safety, and precision at the core of every project. 💪

Because when conditions shift, smart design keeps everything standing strong.

.

06/11/2026

Things are moving FAST at Central Wisconsin Airport! ✈️🚧

The concrete foundation for the new Ovation Terminal is officially finished, and now the final steel beams are being lifted into place. With every beam set, the vision becomes more real—and you can truly start to see this building taking shape right before your eyes. 💪

This project is coming together through the strong partnership between 8PINE. and Industrial Construction Specialists, LLC (ICS), with both teams working side-by-side to keep progress moving safely, efficiently, and at full speed. The collaboration, coordination, and craftsmanship on display have been incredible to watch.

From the ground up, this site is rapidly transforming into something the entire region will be proud of. What an exciting time to see the future of Central Wisconsin Airport rising one beam at a time! 👀

.

06/10/2026

🔦 Employee Spotlight: Bert Pieper 🔦

From the ground up — Bert Pieper, Founder & CEO of 8PINE., built more than a company… he built a vision. 👏

With 30 years of construction experience, Bert leads the way by setting the direction, driving growth, and creating opportunities for the entire 8PINE. team. His journey from the field to leadership is rooted in hard work, dedication, and a passion for building something that lasts.

Family-focused and forward-thinking, Bert is committed to creating a legacy for the next generation — both on and off the jobsite.

. .

06/09/2026

🎉 HARD HATS OFF FOR BRANDON DEVROY 🎉

One year ago, Brandon Devroy joined the 8PINE. team… and he’s been making an impact ever since. 💪🛠️

In the construction world, success is built one day, one project, and one hardworking team member at a time. Brandon has brought the effort, attitude, and determination it takes to help keep 8PINE. moving forward every single day. 🚧⚡

From tackling challenges head-on to being a dependable part of the crew, Brandon has proven to be an important piece of the 8PINE. family. We’re incredibly thankful for everything he’s brought to the team over the last year and excited for what’s still ahead. 🔥

A strong company is built by strong people, and Brandon is a great example of that.

Help us celebrate Brandon’s 1-year anniversary with 8PINE. by dropping a 👏 or 🎉 in the comments below!

. .

Address

101 N. Main Street Suite #2
Shawano, WI
54166

Opening Hours

Monday 7am - 4:30pm
Tuesday 7am - 4:30pm
Wednesday 7am - 4:30pm
Thursday 7am - 4:30pm
Friday 7am - 4:30pm

Alerts

Be the first to know and let us send you an email when 8PINE. INC. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to 8PINE. INC.:

Share