06/19/2026
The guys knocked out part one of this full package job! Land Clearing with all the debris hauled away. Construction driveway graded in and covered with stone. Home site dug out for the crawl space. We will return when it’s time to backfill and rough grade around the house. We will also install the septic system at that time.