05/15/2026
Wrapped up this job in Eastham today. Backfilled and infilled, as well as installed 7 precast frost posts. We never claim to be the best, but we try to do our best to set ourselves apart from the rest. Almost every foundation we do whether required by the engineer or not, is infilled with 3/4” stone for better compaction under the concrete slabs. if the soil under the walls is questionable, we will stop and advise the GC and suggest using stone under the footings as well.