Phase 3 of our sitework project in Worthington, MA is complete — septic system installation.
This project called for a 37' x 12' B43 Eljen system, carefully designed by the engineer to fit a code-compliant leach field into a tight and challenging area of the property. From the start, this lot presented difficulties, including a tough perc test and a less-than-ideal system location on a shelf along the woodline.
We worked closely with the town and engineer to ensure full compliance with Massachusetts wetlands regulations, as the system falls within the 100-foot riverfront buffer zone. This required coordination, approvals, and filing an RDA with the state to move forward properly.
Site conditions added another layer of complexity. While the soil itself was workable, the amount of underlying ledge made installation extremely challenging. We were able to set the 1,500-gallon septic tank just before hitting ledge, and adjusted elevations slightly to avoid unnecessary rock excavation while still maintaining proper pitch.
Running the 4” drain line to the leach field brought additional challenges. What should have been a straightforward run turned into a reroute around a blueberry field due to shallow ledge conditions. This required extra bends, careful grading, and additional labor to maintain proper depth and pitch.
Once the system was installed, we circled back to set the tank — all while working through early winter conditions that made an already difficult job even tougher.
Every project has its challenges, but this is one we’re proud to add to the portfolio.
We’ll be returning this summer to complete the final phase, including driveway installation, grading, topsoil, and finishing touches to bring the site together.
If you’re planning a project and need a team that can handle tough conditions and get it done right, reach out.
Call us to schedule your FREE ESTIMATE
📞 413 355 0558
🌐 fleuryexcavation.com
▶️ All American Excavator
💲💲💲 We offer financing