Progress report, patio went in last week. This week progress was slow but finish work and grading is happening next week. Cant wait to post finish pictures. This was a challenging project that will come together like they all do. We changed the design to include a hotub pad in the corner, all the conduit and electrical is pre installed ready for the tub install. We also added a French drain at the edge of the patio/base of wall to protect our patio and ensure the area always stays dry. No project is to challenging for our team.