06/11/2026
How does a flat duct installation work in a modular build?
The process is efficient and space-saving:
1. Air handler out.
2. Flat duct lays on the first-floor ceiling, running the full length of the module.
3. Takeoffs branch off to every room.
4. An end cap closes the run.
The Specs:
At 3.25" x 14", these off-the-shelf components are designed to fit perfectly within the 4-inch interstitial space between stacked modules.
Why it matters:
No other system fits here. This makes it the essential solution for modular HVAC integration.
cobaltcreed.com