Concrete Technology: CTI of Central Wisconsin

Concrete Technology: CTI of Central Wisconsin We are a Company up on Stucco!

*Specializing in new installs, restoration and refacing of EIFS and traditional stucco for commercial and residential projects.
*Installation of epoxy flooring, built up resurfacing , and concrete coatings.

Commercial building refurbishment of the EIFS.   Repaired all the cracks, bad backer sheeting with DensGlass, cut in new...
12/18/2025

Commercial building refurbishment of the EIFS. Repaired all the cracks, bad backer sheeting with DensGlass, cut in new control joints, rebase and mesh, new textured finish coat and caulk. Prepped the fluted block and coated with new Sherwin-Williams SuperPaint. Repaired all the overhead steel drip caps and flashings.

Hawaiian Tanning Heliotherapy building in Wisconsin Rapids.  An ICF (insulated concrete form) constructed structure.  We...
08/06/2025

Hawaiian Tanning Heliotherapy building in Wisconsin Rapids. An ICF (insulated concrete form) constructed structure. We used a direct-applied exterior plaster system to the front combining the interior arch design to allow for a flow of the architecture.

Just finished a new addition to a 70 year old brick ranch home.  Standard 1” EIFS stucco system.
10/12/2024

Just finished a new addition to a 70 year old brick ranch home. Standard 1” EIFS stucco system.

A complete refurb of the American Gas & Welding building on Church St in Stevens Point.  Repair of the stucco, steel roo...
10/01/2024

A complete refurb of the American Gas & Welding building on Church St in Stevens Point. Repair of the stucco, steel roof cap, flashing, gutters, caulking, and new Sherwin Williams paint.

Just finished a complete restoration of this beautiful Wisconsin Rapids home.  Entire re-caulking of the exterior, misce...
09/18/2024

Just finished a complete restoration of this beautiful Wisconsin Rapids home. Entire re-caulking of the exterior, miscellaneous repairs and 2 colors of Sherwin Williams Emerald exterior paint. It will last for many years.

One of two sections of a Wausau church after a fire.  Demo, framing, sheeting, build-out and stucco.  The flame and cros...
08/01/2024

One of two sections of a Wausau church after a fire. Demo, framing, sheeting, build-out and stucco. The flame and cross are 3-dimensional built out of foam and then plastered to create a one-piece wall.

A large capital improvement project on the Waupaca County Courthouse.  New offices in the basement require an emergency ...
07/12/2024

A large capital improvement project on the Waupaca County Courthouse. New offices in the basement require an emergency egress, so remove 200 yards of dirt along the west basement wall, install windows and add 2” styrofoam insulation and make it look nice. We had all the flashing bent to order, cut grooves in the concrete to insert the flashing then tuck-point in place. Head and base flashings for the windows, mechanical fasteners (tapcons) to fasten the foam in place. Hot knife 2” grooves for decorative reveals, mesh and plaster. This will get a 10’ retaining wall and fence to complete. End of phase one. Phase 2 will be the east side of the building in 6 months, same process but hopefully without the 9” of rain we dealt with trying to get this completed.

How to make an early 1970’s limestone stack fireplace go away, but still be a fireplace.  The owners have this stone all...
06/19/2024

How to make an early 1970’s limestone stack fireplace go away, but still be a fireplace. The owners have this stone all over the house and wanted something different. It was pretty involved. It will get a gas insert.

Just completed an interior three season sunroom addition.  Did a hardcoat exterior system: hung Dens-Glass exterior rein...
04/13/2024

Just completed an interior three season sunroom addition. Did a hardcoat exterior system: hung Dens-Glass exterior reinforced Sheetrock, plastered with re-mesh and finished with a freestyle skip-trowel texture. Came out beautiful.

The new Schierl Tire building next to their tire center in Plover.  We had some weather challenges but got it done.
04/13/2024

The new Schierl Tire building next to their tire center in Plover. We had some weather challenges but got it done.

Who would imagine we can tackle a big spring project in early February without tenting in!   New parapet walls, repair a...
02/14/2024

Who would imagine we can tackle a big spring project in early February without tenting in! New parapet walls, repair and restoration on preexisting walls and pillars. The new Subway on the UW-Stevens Point campus.

All new stucco on this 30 year old home that did not have properly flashed stone work.  It was a mess, and became a very...
11/08/2023

All new stucco on this 30 year old home that did not have properly flashed stone work. It was a mess, and became a very involved project because they neglected $5 of metal flashing and some common sense.

Address

717 W Clark Street
Stevens Point, WI
54481

Telephone

+17154981087

Website

Alerts

Be the first to know and let us send you an email when Concrete Technology: CTI of Central Wisconsin posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category