04/16/2018
Stevensville MT Project
For this job, we re-roofed two apartment buildings. After installing ice and water shield in compliance with building code, we used a synthetic titanium dry-in material for the remaining roof area. We installed a limited lifetime architectural shingle to both buildings and cut in and installed ridge vent and matching ridge cap shingles. As always, we removed all debris from the job site.
Thank You Starrett Artists for the great photos and video!
519 Main Street Apartments For this job, we re-roofed two apartment buildings. After installing ice and water shield in compliance with building code, we used a synthetic titanium dry-in material for the remaining roof area. We installed a limited lifetime architectural shingle to both buildings and...