Harkin's Backhoe Service, LLC

Call Directions

Harkin's Backhoe Service, LLC Excavating company! We dig & trench septics & septic systems, basements, waterline, power, etc.

Fixed fitting in an older Cobett were  the fitting was riveted on.  Replaced with 3/4” plastic male adapter.  Brass woul...
10/22/2026

Fixed fitting in an older Cobett were the fitting was riveted on. Replaced with 3/4” plastic male adapter. Brass wouldn’t work. Tennis/Sturgis 10/19/2026

Trench in 250 plus feet of 1 1/2” fusible poly.  Hook into existing 3/4” poly tee & installed 1” stop & drain & Cobett. ...
10/22/2026

Trench in 250 plus feet of 1 1/2” fusible poly. Hook into existing 3/4” poly tee & installed 1” stop & drain & Cobett. Tee by stop & drain run 1 1/2” 20’ past Cobett & cap line for future waterline project. Tore out fence by house & took down tree. Kreutz/Arpan Rd. 10/18-22/2026

Dug up existing 2” poly, tee into & trench 150’ plus feet of 1 1/2” fusible poly.  Add 1 1/2” brass curb stop.  Set pole...
10/22/2026

Dug up existing 2” poly, tee into & trench 150’ plus feet of 1 1/2” fusible poly. Add 1 1/2” brass curb stop. Set pole to run waterline up on pole to water silage. Tennis/Sturgis. 10/13-14/2026

Happy Boss Day!!  He’s not so bad to work with everyday 😉
10/16/2026

Happy Boss Day!! He’s not so bad to work with everyday 😉

Pulled tops off couple hydrants & flushed out junk.  Chased down water leaks.  Dug up a tap that didn’t get tapped right...
10/13/2026

Pulled tops off couple hydrants & flushed out junk. Chased down water leaks. Dug up a tap that didn’t get tapped right. ( size of a sharp pencil is all). Cut tap out, ran new line to stop & drain. Added new curb stop & hydrant in the northeast pasture. Water just isn’t making it that far. Bachand/ Elm Springs Farm 10/6-10/2026

Boom Concrete delivered stock tank we’ve been waiting for on Mintzlaff’s/Hermosa. Set & set float. 9/18/2026 #
10/13/2026

Boom Concrete delivered stock tank we’ve been waiting for on Mintzlaff’s/Hermosa. Set & set float.
9/18/2026 #

Trenched in total of 8,700 plus feet of 2” fusible waterline.  Hooked onto existing 1 1/2” fusible poly added curb stops...
10/13/2026

Trenched in total of 8,700 plus feet of 2” fusible waterline. Hooked onto existing 1 1/2” fusible poly added curb stops by the house to Bear Butte water. (2,030’) Added 2 curb stops by meter pit. Trenched from meter pit to new concrete stock tank from Boom Concrete. Added to 2 hydrants & stop & drain. Jeffery/Sturgis 9/14-10/1/2026

Trench in 1,900 plus feet of 1 1/2” fusible waterline (& 1” poly) from meter pit to future water tank & from existing 1”...
09/11/2026

Trench in 1,900 plus feet of 1 1/2” fusible waterline (& 1” poly) from meter pit to future water tank & from existing 1” pvc line to new hydrant by building. Installed 2 hydrants & added new valves in meter pit. Mintzlaff/Hermosa 8/24-9/2/2026

Dig up waterline leak in Cobett. Replace with 7’ of 1” Poly.  Install curbstop into 3/4” waterline by hydrant that shuts...
08/27/2026

Dig up waterline leak in Cobett. Replace with 7’ of 1” Poly. Install curbstop into 3/4” waterline by hydrant that shuts off Cobetts. Baker’s/ Hermosa 8/17-19/2026

Dig up 1” pvc waterline break.  Install compression coupler.  (777 Ranch) Hermosa Water Users 8/6/2026
08/27/2026

Dig up 1” pvc waterline break. Install compression coupler. (777 Ranch) Hermosa Water Users 8/6/2026

Address

13437 Stoney Creek Trl
Sturgis, SD
57785