02/05/2026
Project of 2 days done in Westbrook Village
These clients had to redo their whole driveway and inside of garage due to pine tree roots.
•1st day was demolition, as you can see the driveway, garage, entryway and sidewalks were demo. The reason was because it was all badly cracked and the roots of the pine tree lift and cracked the sidewalk and inside the garage.
•2nd day was installation, we installed 1,600ft of Phoenix pavers in Territorial Townscape in a 3 piece random pattern.
This work gave this driveway a great fresh look.
Call/text us for your estimate 📞📱
(602)881-1086