Coastal Site Llc

Coastal Site Llc Coastal Site Services is a site work and grading company specializing in riding arena construction and site prep for barns, storm water and small site prep

04/04/2022

We love to see these kinds of videos and feedback! It’s what makes it all worth it!

04/03/2022

Some touch up work on the arena yesterday. A little bit of dressing up and we will be seeding next week, installing a retaining wall for the manure dumpster pad and we will be wrapped up next week. Onto another arena in Lothian and some storm water repairs for Baltimore scrap.

We can see the finish line! This was definitely a struggle for us… between weather and being sick, one truck down as wel...
03/30/2022

We can see the finish line! This was definitely a struggle for us… between weather and being sick, one truck down as well as a skid loader. But we struggled through it, Quinton and I learned some good lessons and we never slacked on quality or took shortcuts.

Some progress photos of our Davidsonville job. In between the rain drops we are pushing to get closer to a finished prod...
03/23/2022

Some progress photos of our Davidsonville job. In between the rain drops we are pushing to get closer to a finished product!

The site looked like a bomb went off early this morning. We were pushing off mud, undercutting and hauling in millings. ...
03/19/2022

The site looked like a bomb went off early this morning. We were pushing off mud, undercutting and hauling in millings.

By the end of the day we had the parking lot and 90% of the roads graded and rolled in. It felt good to start getting some finished product.

We are rolling in the road base today. We had just enough rain to hold us up from hauling in the millings to top off the...
03/17/2022

We are rolling in the road base today. We had just enough rain to hold us up from hauling in the millings to top off the base. Hopefully we can get back at it tomorrow to keep pushing forward to make the deadline for completion.

Once we complete the road, our trucks will be able to back into the arena bringing in 576 tons of blue stone dust.While ...
03/12/2022

Once we complete the road, our trucks will be able to back into the arena bringing in 576 tons of blue stone dust.

While we are hauling in the dust we will finish the topsoil and stabilize

We ended the week well and boxed out for a road, topsoiled the slopes and dressed up for the weekend. Although March is ...
03/12/2022

We ended the week well and boxed out for a road, topsoiled the slopes and dressed up for the weekend.

Although March is throwing us a wild card tomorrow forecasting 3” of snow, the weather from there on out looks like it’s starting to change and it’s time to get some of these new projects started!

03/09/2022

Operating Beyond Expectations. Client satisfaction is our goal. And we mean it.Coastal Site Services performs excavating, grading, storm water management and small utility services. Because so much of our work has tight tolerances, we pride ourselves on being precise. We have a passion for using the...

The last step to the storm drain system was tying in the rain leaders and wash stalls. We’ve got to kick it into high ge...
03/09/2022

The last step to the storm drain system was tying in the rain leaders and wash stalls.

We’ve got to kick it into high gear as we have a good bit of work left on this project and another storm drain project to knock out before starting a small site job with a new client.

Way over due maintenance on my pick up today, my boys were there to give a hand and learn.We started dedicating Sundays ...
03/06/2022

Way over due maintenance on my pick up today, my boys were there to give a hand and learn.

We started dedicating Sundays to family time… this was still kind of working and looks a little different than we had imagined when we started doing this, however we were all involved, spending time together and had a great day!

We poured the bottoms and built channels for the inlet and man hole we built. We have 2 more rain leaders and a stall dr...
03/05/2022

We poured the bottoms and built channels for the inlet and man hole we built. We have 2 more rain leaders and a stall drain to tie in yet but the bulk of the storm drain is complete on this project.

This was a lot of work and a lot of time and thought put in to make everything work just right.

Address

Taneytown, MD
21787

Website

Alerts

Be the first to know and let us send you an email when Coastal Site Llc posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Coastal Site Llc: