05/19/2026
I have said it beforeā¦..estimates are a like a non profit jobā¦lol!
So, I will dare to be different and let you get your estimates from those who love to give free estimatesā¦..
I will split the difference between the middle and low estimate, from legitimate licensed contractors, plus $0.06 per $1. This fee will be divided between the three estimates to pay those fine gentlemen for their servicesš.
However, if they are smarter than me , and charged you for an estimate, we will pick a charity together that benefits orphans or widows in distressā¦A real charity that actually goes to those in need rather than the admin!
After all, my friends, this is what the God Almighty refers to religion as being faultlessā¦..besides keeping ones self from being polluted by the world.š
I also would be happy to donate it to a family that is struggling financially from an illness or another unfortunate event.
And finally, The estimated materials must be accurate to the jobās need. Low bids due to engineered waste product, like osb, cannot be used, or I can also base this off labor cost of the estimate onlyš! This is experimentalā¦. and scratch the āexperiā, it may just be mentalš¤£ā¦ am I right?
Keep in mind, some estimates are not ācut and dryāā¦. remodels or repair jobs based on T&M due to unknown damage, kinda gotta be excluded due to the obviousā¦. but we can figure somethin out š
Butā¦think about itā¦. Do you really wanna pay the cost of labor these days to build a temporary structure with junk? š¤£