11/12/2025
It's been awhile since I made a post, hurt my back falling down stairs so I've been off for a little while.i finished that siding job, everything had to be fixed almost every single window and door had rot coming out of it but all done and client is very happy ,no more water coming in.. now I'm on to this bathroom remodel as you can see the floor was pretty bad all the tile was just sitting there they had two layers of OSB on there as I got down to the main deck layer turns out it was just half inch and not three quarter so I'm having to replace the entire bathroom deck so that the floor is same height. They had toilet fl**ge facing the wrong way and two spacers on top of it now that's all cleaned up back down to just one fl**ge facing the correct way being supported by a three-quarter inch floor like it's supposed to be..If your looking for not having to deal with multiple trades and alot of people in your home.with unmatched skill level now is the time to give BIG DOG a call to get put in the schedule for your project for I am booked solid until spring. have a great holiday season