05/07/2026
What a day on Torch Lake.
The kitchen cabinets are nearly in, that lets us get into the details of countertop templating that will have the granite tops running right up to the window.
and our Trim team are all on site to work out the finer details to execute it perfectly.
is on site doing the final touches on the ceiling beams, the tongue and groove ceiling, and the living room built ins.
is getting close to switching us from temporary heat to the homes own heating system, as well as readying to get the plumbing fixtures installed.
is moving some heavy stuff outside
and
is somewhere on the roof as he continues his amazing stone work on the chimney, once that is done he’ll be heading inside for a custom fireplace and shower