07/12/2021
This room is getting close to completion! Just a little paint touch up and final inspection and thats a wrap. This customer had old peeling linoleum flooring and huge variances in subfloor level. I patched the holes in the floor from old vents, leveled the entire subfloor, installed new moisture barrier, layed down these goregous wide plank pine floors, got them nailed in with crispy lines, built a custom transition, stained and sealed them and installed all new trim in the room. Very happy with how this came out!