08/12/2026
Lastest job completed. This was a long one with a ton of work. Gutted the entire 1st floor, all new secondary walls built to hide block work, windows, doors insulation, sheetrock, wood floors, tile, paint, trim, cabinets, new cedar siding in some sections, etc. You name it & it was replaced. Also added & laundry room & walk in closet to the 2nd floor & topping it all off, an elevatorwas also added for the owners. This home turned out amazing.