Us north bridges

Us north bridges We maintain our excavators, skidsteers, trucks, and trailers to provide you with turnkey project sol

2014 Freightliner Cascadia Stock Number:P86765Mileage:795,745 miEngine Manufacturer: DD15 DETROITHorsepower:450hp$24.500...
11/15/2022

2014 Freightliner Cascadia
Stock Number:P86765
Mileage:795,745 mi
Engine Manufacturer: DD15 DETROIT
Horsepower:450hp
$24.500.00
Air-ride Suspension; Tandem Axle; Black Color; 6x4 Drive; Drive Side: Left Hand Drive; Yes Engine Brake; 13,200 lb Front Axle Weight; Diesel Fuel Type; 53,200 lb Gross Vehicle Weight; 3.36 Ratio; 20,000 lb Rear Axle Weight; 72 in Studio Sleeper; 11R24.5 Tires; 219 in Wheel.
.
Contact Us,
1-800-490-9721 Office
[email protected]
4040 Vista Park Ct Sacramento Ca, 95834

2013 Kenworth T-660 Aerocab Stock Number:P59541Mileage:689,745 miEngine Manufacturer: CumminsHorsepower:525hp$22.750.00A...
06/06/2022

2013 Kenworth T-660 Aerocab
Stock Number:P59541
Mileage:689,745 mi
Engine Manufacturer: Cummins
Horsepower:525hp
$22.750.00

Air-ride Suspension; Tandem Axle; White Color; 6x4 Drive; Drive Side: Left Hand Drive; Yes Engine Brake; Cummins Isx 15.L 525 hp; 13,200 lb Front Axle Weight; Diesel Fuel Type; 53,200 lb Gross Vehicle Weight; 3.36 Ratio; 20,000 lb Rear Axle Weight; 72 in Studio Sleeper; 11R24.5 Tires; 219 in Wheel...

Contact Us,
1-877-455-1065 Office
916-530-5359 Direct
[email protected]
4040 Vista Park Ct Sacramento Ca, 95834

Bridge demolition often begins at night and ends early in the morning. Portions of the bridge are removed in a short wor...
05/28/2020

Bridge demolition often begins at night and ends early in the morning. Portions of the bridge are removed in a short work window, and traffic resumes as normal in the morning as if no inconvenience has occurred.

CONCRETE RECYCLINGWe maintain our excavators, skidsteers, trucks, and trailers to provide you with turnkey project solut...
05/28/2020

CONCRETE RECYCLING

We maintain our excavators, skidsteers, trucks, and trailers to provide you with turnkey project solutions. We constantly push to beat company records for a variety of metrics including fastest demolition of a single story home and most loads of concrete hauled in a day. The culture of competitive benchmarking that we have engendered guarantees that your project will get pushed to the limit.

Because bridge demolition jobs are extremely complex, the firm completing the job must have a rich and diverse backgroun...
05/27/2020

Because bridge demolition jobs are extremely complex, the firm completing the job must have a rich and diverse background. Aggregate Technologies is the leading construction firm in many different areas of concrete cutting, pile demolition, and has a sterling record when it comes to working safely and efficiently. Every bridge is different, but Aggregate Technologies and its experienced team of contractors and engineers have the experience and know-how to bring it down safely and ahead of schedule.

ENVIRONMENTAL REMEDIATIONSimplify environmental remediation with Green Circle Demolition. From thorough documentation to...
05/27/2020

ENVIRONMENTAL REMEDIATION

Simplify environmental remediation with Green Circle Demolition. From thorough documentation to professional removal and disposal, we can manage all your environmental remediation risks.

Address

5450 N Camino De La Tierra
Tucson, AZ
85705

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 2pm

Telephone

+18772851548

Alerts

Be the first to know and let us send you an email when Us north bridges posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share