02/06/2026
A remodel done back in the day 2020 for a friend of ours. She wanted more room for glam and a tub for soaking. This was a project in a Second Floor Master Bedroom. Usually, we convert tubs to showers. But we have no problem doing the vice versa. One of my first whole bathroom remodels. Didn’t have all the resources we do now, but definitely got the job done.!
Here, we removed her shower wall panels and pan to again install a new tub with a new sliding door. That also included new subway tile surround to the ceiling and a centered niche for shower essentials. To give it accent and match the bathroom floor we added a decorative strip accross the whole shower and niche. 💯 All prep work, demo and install was done by yours truly and the guys with LRTIR. That means we also did the plumbing, reframing and rebuild to make sure it is waterproof. 💯
The next part of this project was the actual bathroom floor. Again, the guys with LRTIR performed the demo, prep and install. After placing our cement boards, we covered the whole floor and closet with this Mexican look alike tile. Right on top of that we added taller baseboards with new corner pieces to finish off the floor. 💪🏼
Other work done here included, removing her closet door and reframing, to giving her a wider, doorless entry into her closet. We also, removed her 2 sink vanity and installed a single pedestal to make room for her make up desk set up. To finish up we also switched out a light fixture for better lighting.
We didn’t get to see it finished up with paint and all but the strong foundation was set. 💯💯💪🏼💪🏼
Thanks for trusting the work.