03/23/2026
Saw cut and removed an 18” section of concrete around the pool to remove the rotted aluminum coping, poured back a nice cantilever edge concrete coping with new liner track, applied our slip resistant, heat resistant textured coating, nickel colored band, silver colored deck, then finished it off with a decorative saw cut to compete the brand new surface. Clearview pools installed the new liner.
This entire process on our side took 3 days to complete. If you’re concerned about your pool being out of service don’t, we can have you up and running in just a few short days!
Call today to get your free estimate lined up