A lot of people see the progress. They don’t always see the challenges behind it. 🏗️
One of the biggest challenges we’ve had so far at Project Palm came down to a small piece of hardware.
The engineer required a specific ridge beam connector, but it wasn’t something our suppliers carried. Because of the roof design, standard brackets wouldn’t work, so we had to have custom ones fabricated for the project.
It took about two weeks to get them made, but that’s sometimes the reality of construction. Every project is different, and occasionally you run into details that require a custom solution.
More Project Palm updates coming soon! 👀