06/07/2026
We’re proud to have been part of not one, but two homes featured in the Tyler Area Builders Association (TABA) Parade of Homes this year.
For the Lindale project, 3G completed the extensive site preparation that transformed the property from raw land into a build-ready homesite. This included clearing approximately 2.5–3 acres of timber, installing the driveway culvert, prepping the driveway, constructing a pond with a culvert crossing, building the house and shop pads, completing finish grading, and placing gravel around the shop.
On the Winona project, we prepared the house pad, completed driveway preparation, installed the road culvert, and performed the final grading to get the property ready for its finished look.
Every project starts with a solid foundation, and that’s exactly what we strive to provide. Whether it’s land clearing, ponds, driveways, pads, grading, or complete site preparation, we’re committed to helping bring our customers’ visions to life.
Congratulations to the homeowners and builders on these beautiful homes, and thank you for trusting 3G to be part of the process.