🌧️ 30 Years of Erosion Fixed the Right Way
This project involved rebuilding a pond overflow spillway system that carries excess water from the pond and directs it into a nearby creek through a culvert 👇
Over time erosion allowed water to get underneath a 30+ year old steel culvert which eventually caused a 4 foot washout and compromised the spillway ❌
We fully excavated the failed area and removed the existing pipe. From there we rebuilt it the right way starting with a properly compacted subgrade and installing crushed concrete road base below and around the entire culvert. This creates a solid locked in foundation that helps prevent movement settling and future washouts 💪
We installed a larger 40 foot ADS culvert to improve flow capacity during heavy rainfall and ensure the overflow water is safely carried from the pond into the creek as designed.
Everything was backfilled and compacted in lifts then the entire spillway was regraded to restore proper drainage and long term stability 🚀
Built to handle heavy flow and prevent future erosion done the right way so it lasts!